The project is a new field development in 750m water depth and 100km south of the Nigerian coast.
The project is being developed with 42 subsea wells connected to a 2MMbbls storage FPSO via 2...
- MAIN RESPONSIBILITIES:
* QS controls that COMPANY and CONTRACTOR complies with their Contract Obligations. More specifically before approval by Project Manager QS review the Project QA System and...
For a project which mainly consist of the following additional surfaces facilities:
Production platform, Gas treatment for export, Gas lift and Fuel gas, Water treatment in injection, Topside,...
The project is a new field development in 750m water depth and 100km south of the Nigerian coast.
The project is being developed with 42 subsea wells connected to a 2MMbbls storage FPSO via 2...